Bondfield Construction; click here to return to the Home Page
Find Bondfield Construction on Facebook.
Follow Bondfield Construction on Twitter.

Design Build

View Profile PDF Return to Portfolio
Sheridan College HMC Phase 2 Project
Sheridan College HMC Phase 2 Project
Sheridan College HMC Phase 2 Project Sheridan College HMC Phase 2 Project Sheridan College HMC Phase 2 Project
Sheridan College HMC Phase 2 Project
Renderings courtesy of Montgomery Sisam Architects / Moriyama & Teshima Architects

LEED Silver

Sheridan College HMC Phase 2 Project

Mississauga, Ontario

Clients

Sheridan College Institute of Technology and Advanced Learning
Infrastructure Ontario

Consultants

Montgomery Sisam Architects
Moriyama & Teshima Architects

Project Completion Date

January, 2017

Type of Contract

Design Build and Finance

Project Value

$67,300,000

Description

Sheridan College Hazel McCallion Campus Phase 2 will be delivered using the Design-Build-Finance (“DBF”) Model, which requires the successful private sector consortium to design, build and finance the Project.

The proposed HMC Phase 2 building will be located on a 1.84 acre site north of HMC Phase 1 and connect by an elevated enclosed bridge.  The new facility will be approximately 185,000 sf to expand Sheridan’s program offering and include:

  • New teaching space including state-of-the-art classrooms, studio space and specialized computer labs
  • A Centre of Creative Thinking intended to facilitate networking and collaboration between students, faculty and industry
  • Faculty office and administrative space
  • Retail space including a bookstore, printing and food services
  • Gallery space to celebrate student creativity and innovation
  • LEED Silver certification
  • Sustainable design including innovative heating, cooling and water systems, etc, for a positive impact to the ecological health of the surroundings